Automatic Horizontal Continuous Casting Machine China CCM Plant

Automatic Horizontal Continuous Casting Machine China CCM Plant Featured Image
  • Automatic Horizontal Continuous Casting Machine China CCM Plant
  • Automatic Horizontal Continuous Casting Machine China CCM Plant
  • Automatic Horizontal Continuous Casting Machine China CCM Plant
  • Automatic Horizontal Continuous Casting Machine China CCM Plant
  • Automatic Horizontal Continuous Casting Machine China CCM Plant
  • Automatic Horizontal Continuous Casting Machine China CCM Plant

Short Description:

概述快速细节质量保证:1年啊rigin: Fujian, China Brand Name: GEILI Dimension(L*W*H): R5.25 Power(W): 1500 KW Applicable Industries: Manufacturing Plant Condition: New Vol...


Product Detail

Product Tags

Overview
Quick Details
Warranty:
1 Year
Place of Origin:
Fujian, China
Brand Name:
GEILI
Dimension(L*W*H):
R5.25
Power(W):
1500 KW
Applicable Industries:
Manufacturing Plant
Condition:
New
Voltage:
380 V
Certification:
ISO 9001:2015
Product Name:
Automatic Horizontal Continuous Casting Machine China CCM Plant
Technology:
Arc Rigid
Type:
Continuous Casting
Steel Type:
Carbon Steel, Bearing Steel, Low Alloy
Casting Type:
Round, Square, Rectangle
Feature:
High Quality
Application:
Casting Steel
After-sales Service Provided:
Field installation, commissioning and training

Production Description

Continuous casting is a new energy-saving technique to casting the molten steel to a section shape or a certain size billet continuously and continuous casting machine is the equipment to complete this process. It includes pouring equipment, major equipment, cutting area equipment, dummy bar collection and transmission equipment. We supply the whole production lines, from induction furnace, CCM to rolling mills, cooling bed and packing.




Company Information


FUJIAN PUTIAN GEILI MACHINERY MANUFACTURING CO.,LTD

wasfounded in 1995,formerly known as Xianyou Rolling Mill Manufacturer.In 2001,merged with Xianyou Bangtou Mill Roll Manufacturer.In 2008,wefocused on continuous casting and rolling production line equipment.In 2011,the company reorganized and established FUJIAN PUTIAN GEILI MACHINERY MANUFACTURING CO.,LTD,whichengaged inmetallurgical equipment,mainly in steel-making,continuous casting andcompleterolling production line research and development,design,manufacturing,installationand general contracting services.






Customer Requirement

Capacity, electricity, land, etc.

Solution Discussion

Technical and design discussion;

Most suitable proposal.

Initial Stage

Provide plan layout diagram;

Provide quotation machinery list.

Detail Check & Confirm

On-site inspection & verification;

Both parties more details discussion.

Contract Confirmation

Final price, supply scope, terms & conditions etc.

Payment

Pay advance payment into the sellers's account;

Issue original irrevovable L/C.

Equipment Production

Design and manufacture according to the supply list

and equipment parameters in the contract.

Shipping Transportation

Delivery at the appointed time;

Provide equipment shipping list and customer declaration data.

现场施工

Equipment foundation;

Supervision for the complete plant engineering;

Installation.

Equipment Commissioning

Conduct cold commissioning and hot commissioning after installation.

Final Acceptance

Buyer's final acceptance of equipment;

Training provided by the supplier.

Perfect Service

24-hour after-sales service;

Provide spare parts purchasing and matainance service technical support.

Quality Control:
Quality control (QC) is a procedure or set of procedures intended to ensure that a manufactured product or performedservice adheres to a defined set of quality criteria or meets therequirements of the client or customer.
Finish Product QC
Ensure all the dimension and technical process are correct
Drawing QC
Ensure all the drawing are inspected by Profesional Enginners
Shipping QC
Ensure the product pass to customer are optimum and correct quantity.

FAQ

Q : Are you trading company or manufacturer?
A: We are manufacturer.

Q:How long is your delivery time?
A:Generally it is 60 days, it is according to quantity requires.

Q:What is the term of payment?
A: Payment <=1000USD, 100% in advance. Payment >=1000USD, 30% T/T in advance, balance before shipment.

Q:Do you have any Oversea Project?
A: Yes, we have service over 20 countries for their Plant set up Project.

If you are interested in this equipment, please don't hesitate to contact us!
If the machine is not suitable for your plant, please e-mail us the following information::
1. What's the quality standard of billet do you want to casting? Is it common carbon steel or low carbon steel?
2. What's the billet size and length?
3. Do you have melting furnace? If yes, how many tons of furnace with how many quantity?
4. What's the capacity per hour?
According to your information, we will offer high efficiency design and best price for it.




  • Previous:
  • Next: